Vocus have sent out the following hazard notification,
Quote:
Start Date: Tuesday 8th November 2011, 07:00 AEDT (UTC +11) End Date: Tuesday 8th November 2011, 17:00 AEDT (UTC +11)
During the above window, Equinix will be performing power work in Mascot SY1 to replace supply breakers on Main Switchboard-B. To ensure that there is no risk to customer load during these works Switchboard B will have its load transferred to the primary UBS System. In the event that the primary UPS system fails, the Automatic Static Transfer Switch (ASTS) will power the PDU from the Redundant (hot standby) UPS-B System. There should be no visibility of these activities to customer equipment. This is a hazard notification only.
|