Crucial Paradigm

Call us now 1300 884 839

Member Login
Australia USA

Location: Australia

Soar with High Availability Web Hosting from $11.95/month Elastic Self-Healing Windows VPS from $54.95/month State Of The Art Infrastructure Powered By Hewlett Packard and Cisco R1 Soft CDP Backup Solution
  #1 (permalink)  
Old 06-09-2010, 02:57 PM
ross's Avatar
Customer Rep
 
Join Date: Jun 2009
Posts: 590
Default Vocus Maintenance Notification - 8th October 2010

Vocus have scheduled the following maintenance window,

Quote:
Start Date: Friday 8th October 2010; 04:00 AEDST (UTC +11), 06:00 NZDST (UTC +13) End Date: Friday 8th October 2010; 06:00 AEDST (UTC +11), 08:00 NZDST (UTC +13)

During the above window, Southern Cross Cable Network will carry out rearrangements to an ODF at Nedonna, this will impact traffic on Segment F3 (Hillsboro to Nedonna) for a period of approximately 20 minutes at some time in the allocated Maintenance Window. As all Vocus circuits have protection on this path, there will be a 50 msec protection switch, plus loss of protection whilst the maintenance takes place. Other than the protection switch, we do not anticipate any impact to customer services.
__________________
Cheers,
Ross

Crucial Paradigm
Reply With Quote
Reply

Thread Tools
Display Modes

Posting Rules
You may not post new threads
You may not post replies
You may not post attachments
You may not edit your posts

BB code is On
Smilies are On
[IMG] code is On
HTML code is Off
Trackbacks are On
Pingbacks are On
Refbacks are On



All times are GMT +11. The time now is 06:35 PM.

Powered by vBulletin® Version 3.8.6
Copyright ©2000 - 2012, Jelsoft Enterprises Ltd.
Content Relevant URLs by vBSEO 3.5.2

Copyright 2003-2010 © Crucial Paradigm Pty Ltd, All Rights Reserved