Crucial Paradigm

Call us now 1300 884 839

Member Login
Australia USA

Location: Australia

Soar with High Availability Web Hosting from $11.95/month Elastic Self-Healing Windows VPS from $54.95/month State Of The Art Infrastructure Powered By Hewlett Packard and Cisco R1 Soft CDP Backup Solution

Go Back   Crucial Paradigm Official Forums > Crucial Paradigm Announcements > Public Announcements

Reply
 
LinkBack Thread Tools Display Modes
  #1 (permalink)  
Old 19-08-2011, 04:10 PM
Aaron's Avatar
Hosting Slave
 
Join Date: Dec 2008
Location: Sydney
Posts: 625
Send a message via MSN to Aaron
Default AU Network Maintenance - 28/Aug/2011 11:00PM -> 03:00AM +10 GMT AEST

In order to continue providing our same high level of service we will be migrating carrier (ISP) cross connects to the new Equinix SY3 datacenter. This is the final part of the planned Data Center migration as detailed here, Announcement: Announcement: Upcoming Infrastructure Improvements

MAINTENANCE WINDOW: Sunday 28th August 2011 11:00PM -> 29/Aug/2011 3:00AM AEST
EXPECTED OUTAGE/DOWNTIME: Multiple periods of complete loss of connectivity lasting up to 20 minutes each. Though we have planned for much shorter periods.
REASON FOR MAINTENANCE: Physical migration of our carrier (ISP) cross connects from Equinix SY2 to the new Equinix SY3 facility. One cross connect will be migrated at a time so as to minimise downtime to our network, with only small outages expected while connectivity is failed over between the connections. During this time some BGP changes will also be made to further increase the resilience of our network.
SERVICES IMPACTED: During the maintenance window your hosting service may not be accessible from the internet.
OTHER NOTES: During this time, our Support Desk (http://support.crucialp.com) will be available should you still need to liaise with our Support staff.

Any Customers that are running trading applications on their VPS Service's such as Meta Trader should halt all trading prior to this maintenance window starting. You may re-instate your trading once you have full access to your service after the maintenance window has completed.

If you have any feedback regarding this notice, please email feedback@crucial.com.au

Please accept on sincere apologies for any inconvenience caused.
__________________
Aaron Weller
Powered by dare
Crucial Paradigm Staff
Reply With Quote
  #2 (permalink)  
Old 28-08-2011, 10:47 PM
Aaron's Avatar
Hosting Slave
 
Join Date: Dec 2008
Location: Sydney
Posts: 625
Send a message via MSN to Aaron
Default

Hi Everyone,

This maintenance is proceeding at the scheduled time.
__________________
Aaron Weller
Powered by dare
Crucial Paradigm Staff
Reply With Quote
  #3 (permalink)  
Old 29-08-2011, 03:56 AM
Aaron's Avatar
Hosting Slave
 
Join Date: Dec 2008
Location: Sydney
Posts: 625
Send a message via MSN to Aaron
Default

This maintenance was completed successfully with no downtime.
__________________
Aaron Weller
Powered by dare
Crucial Paradigm Staff
Reply With Quote
Reply

Thread Tools
Display Modes

Posting Rules
You may not post new threads
You may not post replies
You may not post attachments
You may not edit your posts

BB code is On
Smilies are On
[IMG] code is On
HTML code is Off
Trackbacks are On
Pingbacks are On
Refbacks are On



All times are GMT +11. The time now is 03:34 AM.

Powered by vBulletin® Version 3.8.6
Copyright ©2000 - 2012, Jelsoft Enterprises Ltd.
Content Relevant URLs by vBSEO 3.5.2

Copyright 2003-2010 © Crucial Paradigm Pty Ltd, All Rights Reserved